• API Bop Spare Parts for Pipe RAM
  • API Bop Spare Parts for Pipe RAM
  • API Bop Spare Parts for Pipe RAM
  • API Bop Spare Parts for Pipe RAM
  • API Bop Spare Parts for Pipe RAM
  • API Bop Spare Parts for Pipe RAM

API Bop Spare Parts for Pipe RAM

After-sales Service: 24/7
Warranty: 12months
Manufacturing Process: Casting
Operation Pressure: 3000psi-15000psi
Material: Carbon Steel
Type: Bop
Customization:
Gold Member Since 2021

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
BBSP
Color
Red
Standard
API 16A
Name
Double RAM Bop
Transport Package
Pallets or Wooden Case
Trademark
Boban&OEM
Origin
China
HS Code
8431431000
Production Capacity
500PCS/Month

Product Description

 

Product Description
BOBAN API16A 13 5/8" 10K Double Ram BOP Cameron Blowout Preventor Features
API Bop Spare Parts for Pipe RAM
Features of Ram

Structure and Application For the doubleface ram, the upperface ram and lowerface of the ram are exactly symmetrical. For various drilling tools with different sizes, it only need to replace the semiannular rubber sealing ring and ram compact, the other parts can be interchanged. The singleface ram can not be turned over; the shearing ram can shear the drilling tool in the hole to seal off the well. The ram BOP with variable bore rams can be used for the sealing off the casing and drilling tools of various sizes within a certain range.

Features of Ram Seal

The seal of the ram putting into effect of the packing wellhead must depend on four seals, i.e. the seal between the top of the ram and housing, the seal between the foreend of the ram and the pipeline, the seal between the housing and the sidegate and the seal between piston rod and side gate.

Locking Device Features

The manual locking device uses manpower to rotate the handwheel to close or lock rams. It should be noted that the manual locking device only can be used to close rams but not to open rams. Be sure to make the manual locking device return to the original position to unlock the rams before opening the rams with hydraulic pressure.

 

Product Parameters

7 1/16" / 5000psi

1.6

1.9

Manual

150

 

7 1/16" / 10000psi

2.22

2.5

Manual

180

 

7 1/16" / 15000psi

7.48

85

Manual

280

Allowed to be fitted with a shear ram

9" /3000psi

1.55

1.9

Manual

140

 

9" / 5000psi

4.7

5.3

Manual

220

 

11" / 3000psi

2.68

3.22

Manual

165

 

11" / 5000psi

5.2

5.45

Manual

220

 

11" / 5000psi

14.6

16.3

Manual

355

Allowed to be fitted with a shear ram

11" /10000psi

6.6

7.4

Manual

250

 

11" / 15000psi

14.4

16.7

Manual

355

Allowed to be fitted with a shear ram

13 5/8" /5000psi

7.4

8.3

Manual

250

Allowed to be fitted with a shear ram

13 5/8" /10000psi

19.9

20

Manual

355

Allowed to be fitted with a shear ram

13 5/8" / 15000psi

17.44

19

Manual

355

Allowed to be fitted with a shear ram

20 3/4" / 3000psi

12.2

13.6

Manual

250

 

21 1/4"/ 2000psi

13.2

15.4

Manual

250

 

Detailed Photos

API Bop Spare Parts for Pipe RAMAPI Bop Spare Parts for Pipe RAM

API Bop Spare Parts for Pipe RAM
 

Certifications

API Bop Spare Parts for Pipe RAMAPI Bop Spare Parts for Pipe RAM

FAQ

Q1. How to get an accurate quotation?
A1: Please provide related technical requirements, drawings, pictures, industrial voltage(solid control equipments) and quantity, our team will provide solutions and quotations in time.

Q2. How about your delivery time?
A2: Generally, for spare parts we have regularly stock; for equipments or drilling tools it will takes 20~30 working days after receiving your deposit payment. Accurate delivery time depends on the items and the quantity of your order. 

Q3. What is the warrantee period of the machine?
A3: We can supply 12 Months warranty for our equipments. We provide 7/24 internet or calling service at your convenience, and also our engineers can provide filed installation or services to your place if needed.

Q4. What's your trade terms and payments terms?
A4: We accepted trade Terms: FOB, CFR, CIF, EXW, CIP, FCA, CPT, Express/Air/Sea Delivery; Usually our payment terms are % advance payment, balance before shipping, L/C should be discussed according to actual order.     


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now