Customization: | Available |
---|---|
After-sales Service: | 24/7 |
Warranty: | 12 Months After Date of Shipment |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Brief Introduction
Oilfield Drilling Mud desilter and Cyclone Desander is the second stage and the third stage solid control equipment to treat the drilling fluid. Desander removes those abrassive solids from the drilling mud which cannot be removed by shakers. We commonly used 8 "and 10" cones desander to separate solid-phase particle size 44-74 in the drilling fluids.Oilfield drilling desander is the best choices for small oilfield solids control system for HDD,CBM, water well drilling, mining exploration industry etc.
Usage & Application Scope
As a solids control equipment of the second stage in drilling operation, oil field Oil and Gas Drilling Fluid Desander is used to remove harmful solid particles of 40-74µm in drilling liquid. Suspending particles can be separated from the liquid under the centrifugal acceleration, by use of working principle of centrifugal subsidence.
Model | BBCS200-1S/2S | BBCS250-1S/2S | BBCS250-3S | BBCS300-1S/2S |
Treatment Capacity | 60m³/120m³ | 100m³/200m³ | 300m³ | 120m³/240m³ |
Cyclone Specs | 8in | 10in | 10in | 12in |
Cyclone Qty | 1nos/2nos | 1nos/2nos | 3nos | 1nos/2nos |
Working Pressure | 0.25~0.4mpa | |||
Inlet Size | DN125mm | DN150mm | DN150mm | DN150mm |
Outlet Size | DN150mm | DN200mm | DN200mm | DN200mm |
Separation Point | 45μm~75μm | |||
Bottom Shaker Model | BBTS60 | BBTS60 | BBZS752 | BBZS752 |
Dimension | 1510×1160X2000mm | 1510×1360×2250mm | 1835×1230×1810mm | 1835×1230×1810mm |
Weight | 570kg/620kg | 670kg/760kg | 1300kg | 1380kg |