• Drilling Rig Parts PS703 Balanced Elliptical Motion Shale Shaker
  • Drilling Rig Parts PS703 Balanced Elliptical Motion Shale Shaker
  • Drilling Rig Parts PS703 Balanced Elliptical Motion Shale Shaker
  • Drilling Rig Parts PS703 Balanced Elliptical Motion Shale Shaker
  • Drilling Rig Parts PS703 Balanced Elliptical Motion Shale Shaker
  • Drilling Rig Parts PS703 Balanced Elliptical Motion Shale Shaker

Drilling Rig Parts PS703 Balanced Elliptical Motion Shale Shaker

After-sales Service: 24/7
Warranty: 12 Months
Certification: CE, ISO 9001:2000, ISO 9001:2008, API
Mesh Shape: Hexagonal
Sieve Mesh Number: 40-200
Layer: Double Layer
Customization:
Gold Member Since 2021

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory
  • Overview
  • Product Parameters
  • Product Description
  • FAQ
Overview

Basic Info.

Model NO.
BBPS703
Material
Steel
Type
Linear
Screen Qty
3
Screen Type
Hook Strip
Screen Sizes
700×1250mm
Transport Package
Pallet or Wooden Case
Specification
2770× 1785× 1690mm
Trademark
BOBAN & OEM
Origin
China
HS Code
8474809090
Production Capacity
50 Sets Per Mouth

Product Description

Product Parameters
Name BEM Shale Shaker
Model BBPS703
Vibration Motion Balanced Elliptical Motion
Treatment Capacity 130m³/h(572GPM)
Motor Power 1.94+1.0kw
Screen Specs. (700×1250mm)×3
Screen Area 2.6m²
Vibration Strength ≤7.1G(adjustable)
Double Amplitude 7mm
Deck Adjustment -1°~+5°
Ex Standard ExdIIBt4 / IECEX / ATEX
Weight 1630kg
Dimension 2770×1785×1690mm
Remark Above data are tested from the drilling mud with viscosity 45s and specific gravity of 1.2g/cm3.
Application Oil Gas Drilling,Water Well Drilling,Trenchless Drilling, HDD
 
Product Description

Balanced elliptical motion shale shaker is abbreviated as BEM shale shaker. Due to its strong vibration force and large amplitude, it can better handle large drilling mud and obtain ideal finished drilling fluids.

Shale shaker is the first phase solid control equipment in drilling fluids processing system, also known as key solids control equipment in drilling mud system, shale shaker decides performance of the whole solids control system.

Drilling Rig Parts PS703 Balanced Elliptical Motion Shale Shaker
Drilling Rig Parts PS703 Balanced Elliptical Motion Shale Shaker Drilling Rig Parts PS703 Balanced Elliptical Motion Shale ShakerDrilling Rig Parts PS703 Balanced Elliptical Motion Shale Shaker
FAQ

Q1. How to get an accurate quotation?
A1: Please provide related technical requirements, drawings, pictures, industrial voltage(solid control equipments) and quantity, our team will provide solutions and quotations in time.

Q2. How about your delivery time?
A2: Generally, for spare parts we have regularly stock; for equipments or drilling tools it will takes 20~30 working days after receiving your deposit payment. Accurate delivery time depends on the items and the quantity of your order. 

Q3. What is the warrantee period of the machine?
A3: We can supply 12 Months warranty for our equipments. We provide 7/24 internet or calling service at your convenience, and also our engineers can provide filed installation or services to your place if needed.

Q4. What's your trade terms and payments terms?
A4: We accepted trade Terms: FOB, CFR, CIF, EXW, CIP, FCA, CPT, Express/Air/Sea Delivery; Usually our payment terms are % advance payment, balance before shipping, L/C should be discussed according to actual order.               

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now