Drilling Manual Blowout Preventer Bop with Double RAM and API Complied

Product Details
Customization: Available
After-sales Service: 24/7
Warranty: 12 Months
Gold Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 14001, HSE
Terms of Payment
LC, T/T, D/P, PayPal, Small-amount payment
  • Drilling Manual Blowout Preventer Bop with Double RAM and API Complied
  • Drilling Manual Blowout Preventer Bop with Double RAM and API Complied
  • Drilling Manual Blowout Preventer Bop with Double RAM and API Complied
  • Drilling Manual Blowout Preventer Bop with Double RAM and API Complied
  • Drilling Manual Blowout Preventer Bop with Double RAM and API Complied
  • Drilling Manual Blowout Preventer Bop with Double RAM and API Complied
Find Similar Products
  • Overview
  • Product Description
  • FAQ
  • Detailed Photos
Overview

Basic Info.

Model NO.
Boban
Manufacturing Process
Forging
Surface Treatment
Spray-Paint
Operation Pressure
N/a
Material
Cast Steel
for Wire Size
0.108", 0.125"
Connection
Un,Qls,Hdqrj
Size
1.5"~5"
Transport Package
Wooden Case
Specification
As per sizes
Trademark
BOBAN & OEM
Origin
China
HS Code
8431431000
Production Capacity
30 PCS Per Month

Product Description

7 1/16" / 5000psi

1.6

1.9

Manual

150

 

7 1/16" / 10000psi

2.22

2.5

Manual

180

 

7 1/16" / 15000psi

7.48

85

Manual

280

Allowed to be fitted with a shear ram

9" /3000psi

1.55

1.9

Manual

140

 

9" / 5000psi

4.7

5.3

Manual

220

 

11" / 3000psi

2.68

3.22

Manual

165

 

11" / 5000psi

5.2

5.45

Manual

220

 

11" / 5000psi

14.6

16.3

Manual

355

Allowed to be fitted with a shear ram

11" /10000psi

6.6

7.4

Manual

250

 

11" / 15000psi

14.4

16.7

Manual

355

Allowed to be fitted with a shear ram

13 5/8" /5000psi

7.4

8.3

Manual

250

Allowed to be fitted with a shear ram

13 5/8" /10000psi

19.9

20

Manual

355

Allowed to be fitted with a shear ram

13 5/8" / 15000psi

17.44

19

Manual

355

Allowed to be fitted with a shear ram

20 3/4" / 3000psi

12.2

13.6

Manual

250

 

21 1/4"/ 2000psi

13.2

15.4

Manual

250

 

Product Description

Blowout preventers (BOP) are the most important well control devices and play an important role in drilling, especially in underbalanced drilling. The purpose of designing a blowout preventer is to close the wellbore under pressure, maintain continuous control of the well, and circulate the formation fluid entering the well.
Hydraulic BOP mainly come in two forms: RAM BOP and ANNULAR BOP. 
The ram blowout preventer mainly consists of a shell, side door, oil cylinder, cylinder head, piston, piston rod, locking shaft, seal, ram, etc. The working process is to use hydraulic pressure to push the piston, drive the ram to close or open, thereby closing or opening the wellhead, achieving the purpose of sealing, and opening the well.
The ram of a ram BOP can be divided into four types: fully sealed, semi sealed, variable diameter, and shear rams, which are used to achieve well sealing under different conditions. The semi sealed ram can seal the corresponding drill pipe, oil pipe, and other pipe tools. If necessary, the drilling tool can also be suspended. When there are no pipe tools in the well, the fully sealed ram can fully seal the wellhead. In special circumstances, the shear ram can cut off the drilling tool. In addition, the flange outlet on the side of the casing can be used for drilling fluid circulation and throttling and well killing operations.

FAQ

Q1. How to get an accurate quotation?
A1: Please provide related technical requirements, drawings, pictures, industrial voltage(solid control equipments) and quantity, our team will provide solutions and quotations in time.

Q2. How about your delivery time?
A2: Generally, for spare parts we have regularly stock; for equipments or drilling tools it will takes 20~30 working days after receiving your deposit payment. Accurate delivery time depends on the items and the quantity of your order. 

Q3. What is the warrantee period of the machine?
A3: We can supply 12 Months warranty for our equipments. We provide 7/24 internet or calling service at your convenience, and also our engineers can provide filed installation or services to your place if needed.

Q4. What's your trade terms and payments terms?
A4: We accepted trade Terms: FOB, CFR, CIF, EXW, CIP, FCA, CPT, Express/Air/Sea Delivery; Usually our payment terms are % advance payment, balance before shipping, L/C should be discussed according to actual order.   
 

Detailed Photos

Drilling Manual Blowout Preventer Bop with Double RAM and API CompliedDrilling Manual Blowout Preventer Bop with Double RAM and API CompliedDrilling Manual Blowout Preventer Bop with Double RAM and API CompliedDrilling Manual Blowout Preventer Bop with Double RAM and API CompliedDrilling Manual Blowout Preventer Bop with Double RAM and API CompliedDrilling Manual Blowout Preventer Bop with Double RAM and API Complied

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier