Customization: | Available |
---|---|
After-sales Service: | 24/7 |
Warranty: | 12 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Drilling mud cleaner is the second or third stage separation equipment of drilling liquids, which will handle the solids particle after being treated by the first grade separation equipment. The mud will be recovered and cuttings which are bigger than mud will be removed. Then the cuttings in the underflow will flow into circulation tanks through the screens when the weighted mud passes while the particles that are bigger than mesh will be removed.
Model | BBQJ200×1S-100×4N | BBQJ200×2S-100×8N | BBQJ250×2S-100×12N | BBQJ250×3S-100×20N |
Treatment Capacity | 60m³ | 120m³ | 240m³ | 320m³ |
Desander Cyclone Specs | 8in | 10in | ||
Desander Cyclone Qty | 1nos | 2nos | 2nos | 3nos |
Desilter Cyclone Specs | 4in | |||
Desilter Cyclone Qty | 5nos | 8nos | 12nos | 20nos |
Working Pressure | 0.25~0.4mpa | |||
Inlet Size | DN125mm | DN150mm | DN150mm | DN200mm |
Outlet Size | DN150mm | DN200mm | DN200mm | DN250mm |
Separation Point | 15μm~44μm | |||
Bottom Shaker Model | BBZS60/N/A | BBZS752/N/A | BBZS752/N/A | BBZS703/N/A |
Dimension | 1510×1160X2000mm | 1835×1230×1810mm | 1835×1230×1810mm | 2419×2150×2147mm |
Weight | 600kg | 980kg | 1250kg | 2350 kg |
1.Integrated desander, desilter, and shale shaker into one body, smaller size;
2.Selected high-chromium-iron lined polyurethane or pure polyurethane, guaranteeing long service life of cyclones;
3. High-manganese alloy steel made screen box, with high strength, lengthening the service life;
4. Adopted international brand vibration motor, Martin or OLI motor;
5. Shaker box undergoes thermal treatment, with heavy anti-corrosive coating, long service life guaranteed;
6. High G-force vibration strength (adjustable), able to be used to separate high specific-gravity mud that has high viscosity;
7. Plate tension and wedge are both available for screen fixation;
8. International brand electrical components.
Q1. How to get an accurate quotation?
A1: Please provide related technical requirements, drawings, pictures, industrial voltage(solid control equipments) and quantity, our team will provide solutions and quotations in time.
Q2. How about your delivery time?
A2: Generally, for spare parts we have regularly stock; for equipments or drilling tools it will takes 20~30 working days after receiving your deposit payment. Accurate delivery time depends on the items and the quantity of your order.
Q3. What is the warrantee period of the machine?
A3: We can supply 12 Months warranty for our equipments. We provide 7/24 internet or calling service at your convenience, and also our engineers can provide filed installation or services to your place if needed.
Q4. What's your trade terms and payments terms?
A4: We accepted trade Terms: FOB, CFR, CIF, EXW, CIP, FCA, CPT, Express/Air/Sea Delivery; Usually our payment terms are % advance payment, balance before shipping, L/C should be discussed according to actual order.